Report from Vector 5

0

Game co-ordinates transmitted 03/07/17.

Pulo initiates system function test to quantum A.I..

Backdates are created for insertion to time-line B.

A question was generated and answered within the specified time-frame with only 0.3% phase interference.

IMG_1342

A short delay calculated to be corrected within a day became stuck within a temporal inversion we hadn’t noticed produced from the area of Vector 3.

The chain-reaction is running now and we have tasked the quantum A.I. to catch up and out-run the reaction in real time.

Pulo had difficulty rendering the necessary circuitry and accordingly held communion with Pope Clementine to receive a wafer.

Will transmit results in next report.

Vector 5 out.